The ADU questions outside the floor plan
Prepare for an ADU site discussion with questions about utilities, access, drainage, and construction responsibilities.

The starting point
An ADU drawing can show every room while leaving major site questions unanswered. The paths for people, materials, water, and utilities belong in the early conversation. Addressing them together helps define a more complete construction scope.
Keep these in mind
- Locate existing services if records are available.
- Separate construction access from finished access.
- Name who reviews and supplies each connection.
Ask where services will connect
Existing service locations and capacity may affect the proposed unit. Identify what is known about water, wastewater, power, and other systems, and which professionals or providers must assess them.
Do not assume a connection is available merely because the main house has service. Confirm the proposed arrangement and who includes that work in a quote.
Plan the route to the building
The finished entrance and the construction access route serve different purposes. Discuss how materials reach the work area and how residents will reach the unit afterward.
Site levels, drainage, and existing landscaping can influence both routes. A builder needs property information rather than just the dimensions of the ADU itself.
Put boundaries in the project record
Design, excavation, utility coordination, and construction may involve different parties. Record responsibilities and the prerequisites for each phase.
When asking A Frame about an ADU, include known site constraints and any documents you already have. Questions can remain open at the first conversation, but they should be visible rather than hidden in assumptions.
A common question
Are utility connections automatically part of an ADU quote?
Not necessarily. Check inclusions and exclusions explicitly; quote boundaries differ with the requested package.

